16.9.14 – Due to the rain our landscaping has been very delayed. The only things left to do are the last coat of render to retainer walls and plant boxes, the fence is going up as we speak and the turf needs to be laid. So will have some updated pics hopefully by the end of next week.
Here is a pic of the family room, its cosy and we love it.
The Landscapers have been hard at work over the last few weeks, all that is left to do is rendering of the retainer walls and garden beds, installation of new Timber Lapped and Capped fences and laying of turf to yard and council strip. Our concreter is coming back to seal the driveway once this has been completed. Then it will be our job to do all the planting in the garden beds around the side and back boundary, we have around 25 meters of plant box to fill.